Heavy Industry » PROJECTS IN GREECE » MANUFACTURING MAINTENANCE PROJECTS » MAINTENANCE WORKS AT THE FURNACES L-3101 & L-3901 DURING THE 2015 SD IN THE ASPROPYRGOS INDUSTRIAL COMPLEX

Description

MAINTENANCE WORKS AT THE FURNACES L-3101 & L-3901 DURING THE 2015 SD IN THE ASPROPYRGOS INDUSTRIAL COMPLEX

 

Project      

:

Maintenance works at the furnaces L-3101 & L-3901 during SD of 2015 in the Aspropyrgos Industrial Complex

Owner

:

Hellenic Petroleum S.A.

Contract

:

8300656 – 18/11/2014

Duration

:

48 days (T/A)

Budget

:

428.578,85

Brief description

 

:

The project was executed in Industrial Facilities of Hellenic Petroleum in Aspropyrgos Attica during the Turn Around 2015 and included the following works:

1. L-3901

• Installation of the blind, opening furnish, erection of external and internal scaffolding for inspection.

• Replacement of tubes in convection section 3 ½ diameter '' (101,6 mm), 14.420 mm length

Materials ASTM A 335 Gr. P5 and 8.05 mm thick.

Total replacements of 16 tubes.

• Replacement of two curves 180o 3 ½ '' P9 material in Radiant section and two curves 90o 3 ½ '' material P11 in the steam collector of convection.

• Quality of welds 100% RT, 100% PT in socket welds, 100% P.W.H.T.

• Hydraulic test furnace at 164,7 kg / cm2 and restorations.

Total welds: 3 ½ '' P11 4 pcs. , 3 ½ '' P5 61 pcs. , 3 ½ '' P9 4 pcs. , 1 ½ '' P5 8 pcs. , 1 '' P5 4 pcs.

2. L-3101

• Installation of the blind, opening furnace, erection of external and internal scaffolding for inspection.

• Replacement of tubes diameter 4”/ 6”/ 8”/ 10” on Radiant section 16,670mm length

Materials ASTM A 335 P9 SCH XS

Replacement of 8 tubes 10 '', 8 tubes 8 '', 4 tubes 6 '', 2 tubes 4 ''.

• Various works such as:

- Replacement of the bottom plates across the burners area

- Replacement of tube supports in the radiant section 10'', 8'', 6'', 4''

- Replacement of expansions (2 pieces) of air ducts.

• Quality of welds 100% RT, 100% PT in socket welds, 100% P.W.H.T.

• Hydraulic tests per box at a pressure 30 kg/cm2

• Restoration, furnace closing and commissioning.

Total welds: 10'' 24 pcs, 8'' 32 pcs, 6'' 39 pcs, 4'' 14 pcs, 11/2'' 8 pcs, Reinforcing Pads 10'' 8 pcs.

All project materials and equipment provided by the owner.

The above project was carried out in parallel with the work requirements engineering construction projects: AF-142205 '' Energy savings in U-3100 units, U-3400, U-4600 '' and AF-142209 '' Energy savings in U-3200 units, U-4100, U-4600 '' in the Aspropyrgos Refineries in the same period of the Turn Around 2015.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.