Project
|
:
|
REME-5838-9 Preparation for the installation of the new electricity unit GT-5
|
Owner
|
:
|
MOTOR OIL HELLAS
|
Contract
|
:
|
23/11/2010
|
Duration
|
:
|
4 months
|
Budget
|
:
|
291.783,83 €
|
Brief description
|
:
|
The project was executed in the Motor Oil (Hellas) Refinery in Corinthos and included the following main activities:
Position Changing of the Oil Loading Arm and New Pipe Line for the Loading.
Position changing of the pump P-872C and construction of the interconnecting piping.
Erection of Pipe Rack (PP-100 & STR-300/400) connecting existing U-7000 with the new GT-5 in the area south of Τank Farm 4.
Route changing of firefighting pipe line southeast of TF-4.
Installation of a new Gas Preheater in U-7000 and the relative interconnecting piping.
Interconnecting Tie-ins for the new unit.
Supply, fabrication and erection of the pipe supports in the Unit of Gas Preheater.
- Supply, fabrication and erection of the pipe rack, rack and pipe support: 135 tons
- Pipe Weldings C.S. : 3000 inches
- Tie-Ins: 41 pieces
- Equipment Installation: 1 Pump, 1 Skid, 1 Loading Arm
|
|
|
|
|
|
|
|
|