Heavy Industry » PROJECTS IN GREECE » REFINERY PROJECTS » REME-5838-9 PREPARATION FOR THE INSTALLATION OF THE NEW ELECTRICITY UNIT GT-5

Description

REME-5838-9 PREPARATION FOR THE INSTALLATION OF THE NEW ELECTRICITY UNIT GT-5

 

Project      

:

REME-5838-9  Preparation for the installation of the new electricity unit GT-5

Owner

:

MOTOR OIL HELLAS

Contract

:

23/11/2010

Duration

:

4 months

Budget

:

291.783,83

Brief description

 

:

The project was executed in the Motor Oil (Hellas) Refinery in Corinthos and included the following main activities:

Position Changing of the Oil Loading Arm and New Pipe Line for the Loading. 

Position changing of the pump P-872C and construction of the interconnecting piping.

Erection of Pipe Rack (PP-100 & STR-300/400) connecting existing U-7000 with the new GT-5 in the area south of Τank Farm 4.

Route changing of firefighting pipe line southeast of TF-4.

Installation of a new Gas Preheater in U-7000 and the relative interconnecting piping.

Interconnecting Tie-ins for the new unit.

Supply, fabrication and erection of the pipe supports in the Unit of Gas Preheater.

  • Supply, fabrication and erection of the pipe rack, rack and pipe support: 135 tons
  • Pipe Weldings C.S. : 3000 inches
  • Tie-Ins: 41 pieces
  • Equipment Installation: 1 Pump, 1 Skid, 1 Loading Arm

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.