Project
|
:
|
Revamping works in fuels, petrol, FCC units
|
Owner
|
:
|
Motor Oil Hellas
|
Contract
|
:
|
7101215 – 12/05/2016
|
Duration
|
:
|
2 months preparation, 15 days S/D
|
Budget
|
:
|
157.815,00 €
|
Brief description
|
:
|
The project was executed in the Motor Oil (Hellas) Refinery in Corinthos and included the following main activities:
- The piping replacement in the Units
- New pipeline installation.
- Total Welding Carbon Steel & Alloy Steel: 2000 inches
- Hydraulic Tests: 20 bar – 130 bar
- Scaffoldings
- Painting
The above project was executed in parallel with the projects ‘’ Unit revamping FCC/ 3100/ 3700 & equipment of GENERAL SHUT DOWN ‘’ and ‘’ Revamping of fuel & petrol units & equipment of GENERAL SHUT DOWN’’ on the same Shut Down period 2016.
|
|
|
|
|
|
|
|
|