Project
|
:
|
Construction of a new pipeline
|
Owner
|
:
|
Hellenic Petroleum S.A.
|
Contract
|
:
|
30/10/2008
|
Duration
|
:
|
2 months
|
Budget
|
:
|
101.123,19 €
|
Brief description
|
:
|
The project included the following works:
· Detailed line routing design.
· Prefabrication and construction of piping and equipment supports.
· Prefabrication and construction of 18'' water pipeline.
· Construction of ship loading equipment.
· Sandblasting and painting of pipes and steel structures.
All the works were executed in 24 hours base. All main piping materials were supplied by HELPE .
|
|
|
|
|
|
|
|
|