MAINTENANCE WORKS AT THE UNIT U-3300 DURING THE SD 2011 [2003]

 

Project        

:

Maintenance works at the unit U-3300. Turn Around (T/A) 2011

Owner

:

Hellenic Petroleum SA

Contract

:

04 / 10 / 2011

Duration

:

Turn around (T/A) 22 days

Budget

:

607,956.00 €

Brief description

:

The project was  executed at the industrial facilities of Hellenic Petroleum in Aspropyrgos Attica and included the following works:

a. Furnaces maintenance works L-3301/3302/3302N/3303. Opening of furnaces, erection of internal scaffolds, replacement of tubes, quality controls, furnaces' closing.

 In total, 111 tubes were replaced including 222 welding tasks.

Tubes data: new tube material STM A213 Gr. T9, old tubes ASTM A335 Gr. P22 , thickness 7.11 mm, diameter 3 1/2" (101.6 mm).

b. Equipment maintenance for unit U-3300

§          Erection of scaffolds, blinding, equipment opening, repairs, hydraulic tests, closing and restoration.

§         Replacement of valves and safety valves 1" ÷ 24".

§         Opening of Reformer Reactors for catalyst replacement, cleaning and closure.

Pipe, valves and safety valves materials were supplied by the Owner.

 

 

PROJECT CERTIFICATION

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.