Ελληνικά English
sitemap
Search
Heavy Industry » PROJECTS IN GREECE » REFINERY PROJECTS » MAINTENANCE WORKS ON FURNACE L - 3101 (A & B BOX) / TURN AROUND (T/A) 2007

Description

MAINTENANCE WORKS ON FURNACE L - 3101 (A & B BOX) / TURN AROUND (T/A) 2007 [2016]

Project    

:

Maintenance works on furnace L-3101 (A & B BOX) . Turn around (T/A) 2007

Owner

:

Hellenic Petroleum SA

Contract

:

05 / 03 / 2007

Duration

:

Turn around (T/A) 10 days

Budget

:

147,689.00 €

Brief description

:

The works were carried out at the industrial facilities of Hellenic Petroleum SA  in the area of Aspropyrgos, Attica, and included the following:

§          Blinding, opening of furnace, construction of internal scaffolds for inspection

§         Replacement of tubes at the radiant section and supports recommended during the inspection, quality control, hydraulic test

§         Closing of furnace, restorations and  precommissioning

§         Various maintenance works for unit U-3100, such as 8’’ line replacement at the top of tower Ν-4002, replacement of part of steam line S1  4”

Tube section: 6” and 4’’, thickness 8.5mm, material Α-213 GrT9, length 16,670mm

20 tubes of 6’’ and 4 tubes of 4’’ were replaced.

Welding in total: 6” 120 pcs, 4” 16 pcs

 

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.