Heavy Industry » PROJECTS IN GREECE » FUELS INSTALLATIONS » REVAMP OF PUMP STATIONS AND ERECTION OF NEW TRANSFER LINES

Description

REVAMP OF PUMP STATIONS AND ERECTION OF NEW TRANSFER LINES [2119]

Project      

:

Revamp of pump stations and erection of new transfer lines

Owner

:

ΒΡ Hellas SA

Contract

:

2001-2002

Duration

:

Partial works. Total duration 14 months

Budget

:

762,600.00

Brief description

:

The project was  executed at the facilities of BP Hellas at Aspropyrgos, Attica and included the following works:

§     Replacement of three pumps and addition of a new pump at the  pump stations of phases Α and Β

§     Modification of lines at the  pump stations due to products change (suction – collapse of pumps)

§     Construction of two product lines 12" and 6" from  pump stations to fillers

Pipe networks C.S 2" – 12"

All equipment and materials of pipes networks were supplied by the Owner.

The metallic profiles for steel structures and supports, as well as the sand blasting - painting materials were supplied by our company.

All works were performed without interruption to the smooth operation of the facilities.

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.