The works were carried out at facilities of Linoperamata of Crete and in the facilities of BP Hellas in Kalamata, and included the following.
1. Linoperamata, Crete, facility
§ Construction and installation of fire extinguishing water lines and fire extinguishing foam lines of the facility
§ Installation of eastern fire extinguishing branch and construction of section of fire extinguishing line south of the loading lines
§ Installation of new pipe network at the biological waste treatment complex
§ Installation of new fire extinguishing pump at the central pump station and pipe conversions
§ Construction and installation of reception lines of tanks No 3 – 4 and changes at the reception node
2. Kalamata facility
§ Partial installation of tank input pipe lines
§ Installation of new sections of fire extinguishing pipes at the pump station and distribution network
Pipe networks: c.s. 1"÷16".
The equipment and the materials for pipe networks were supplied by the owner.
The metal profiles for the steel structure and supports, the materials of construction works, wherever carried out, as well as the sand blasting-painting materials were supplied by our company.
All works were carried out without any interruption to the smooth operation of the facilities.
|