Project
|
:
|
Maintenance works on tower T-101
|
Owner
|
:
|
Hellenic Petroleum SA
|
Contract
|
:
|
29 / 09 / 2009
|
Duration
|
:
|
(T/A) 19 calendar days
|
Budget
|
:
|
128,333.00 €
|
Brief description
|
:
|
The project was executed at the industrial complex of Hellenic Petroleum, in Thessaloniki and included the following works:
- Placement of blinding, opening internally and externally of the tower, dismantling of trays for the placement of internal lining and re-installation of trays after the works.
- Installation of internal lining at the shell of the tower with strengthening monel sheet & stainless steel
- Repairing and replacement of trays
Monel lining height: 2745mm, monel thickness: 3mm
Tower internal diameter: 3674mm
All the materials for internal lining (monel) and for the trays were supplied by the Owner
|
|
|
|
|
|
|
|
|