Ελληνικά English
sitemap
Search
Heavy Industry » PROJECTS IN GREECE » PORTS - ENERGY PROJECTS » PARTIAL REPLACEMENT OF UNDERGROUND GASOLINE, DIESEL AND JET PIPELINES FROM TANK FARM TO PIER

Description

PARTIAL REPLACEMENT OF UNDERGROUND GASOLINE, DIESEL AND JET PIPELINES FROM TANK FARM TO PIER [1183]

Project  

:

Partial replacement of underground gasoline, diesel and jet pipelines from tank farm to pier.

Owner

:

ΒP Hellas SA

Contract

:

2006

Duration

:

6 months

Budget

:

519,116.00 €

Brief description

:

The works were carried out at the facilities of BP Hellas, in Aspropyrgos, Attica, and included the following:

§     Partial replacement of the three reception pipes (12’’ for gasoline, 16’’ for petroleum and 16’’ for Jet A1) from the Aspropyrgos facilities to pier, at the DEPA SA’s passage location, and inside the facility, near the loading entrance of the Hellenic Petroleum SA

§     Rearrangement works of pipes at the reception system from the pier

The works included all civil works (earth and cement works, shoring up etc).

The materials for the pipe networks were supplied by the owner, the materials related to civil works by our company.

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.