Project
|
:
|
Construction of pipe lines for the interconnection between HELPE E.I.C. and EKO tank farm at Elefsina
|
Owner/Customer
|
:
|
ΕΚΟ SA / Asprofos SA
|
Contract
|
:
|
23 / 10 / 2007
|
Duration
|
:
|
9 months
|
Budget
|
:
|
1,727,699.00 €
|
Brief description
|
:
|
The project was executed at the industrial complex of the Hellenic Petroleum and EKO in Elefsina Attica and included the following works:
Civil works of foundations of equipment and pipe racks, culverts, installation of new equipment, steel structures and supports, construction of piping networks of petroleum products, electrical and instrument – automation works, thermal insulation of pipes and sandblasting-painting works.
The equipment (pumps, vessels, instruments and automations, etc), the materials for pipe network and the materials for the cables of electrical-instruments were supplied by the Owner.
The materials for the civil works, metal constructions of any kind, for the thermal insulation works and also for the sandblasting-painting works were supplied by our company.