Heavy Industry » PROJECTS IN GREECE » FUELS INSTALLATIONS » MECHANICAL WORKS FOR THE INTERCONNECTION OF THE INDUSTRIAL COMPLEX A.I.C. WITH HELLENIC FUELS (EL.KA) - (Α' PHASE WORKS WITHIN A.I.C. AREA)

Description

MECHANICAL WORKS FOR THE INTERCONNECTION OF THE INDUSTRIAL COMPLEX A.I.C. WITH HELLENIC FUELS (EL.KA) - (Α' PHASE WORKS WITHIN A.I.C. AREA) [2046]

 

Project      

:

Mechanical works for the interconnection of the industrial complex A.I.C. with Hellenic Fuels (EL.KA).  (A' Phase – works within A.I.C. area)

Owner

:

Hellenic Petroleum SA

Contract

:

23 / 03 / 2011

Duration

:

5 months

Budget

:

741,328.00 €

Brief description

:

The project was  executed at the industrial  complex of Hellenic Petroleum  and Hellenic Fuels in the area of Aspropyrgos, Attica, and included the following works:

Complete prefabrication and erection of piping network of petroleum products and utilities with their supports, study of  links and joints, material supply, prefabrication and erection of metal pipe racks

Total weight of  steel structures and supports: 53,400 kg

Diameter inches: 14,865"

All the materials for the piping network were supplied by the Owner.

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.