Foods » PROJECTS IN GREECE » NEW EQUIPMENT INSTALLATION AND PIPING WORKS

Description

NEW EQUIPMENT INSTALLATION AND PIPING WORKS

Project   

:

New equipment installation and piping works

Owner

:

DELTA  Dairy Industry SA

Contract

:

1995

Duration

:

6 μήνες

Budget

:

696,000.00 €

Brief description

:

The project was  executed at the milk factory of Delta at Tavros, Attica and included the following works:

a. Construction of production equipment interconnection pipes.

     Networks ΙΝΟΧ 316

b. Construction of all ammonia networks of the freezer assembly

    (Networks -450C, -250C, -80C), such as:

§     Full construction of ammonia chiller including 12 pcs of ammonia compressors of various degrees, connection of all air coolers of preservation chambers, freezers, deep freezers, construction of all yard networks for the interconnection of engine room and air coolers. (Materials carbon steel Φ1''¸12'')

§     Construction of all necessary metallic fixtures of pipes.

All materials for pipes, valves, automations, etc. were supplied by the Owner with the exception of metallic fixing elements

 
<< Previous  |  

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.