Description

PROJECTS FOR THE MODERNIZATION OF FUEL FACILITIES [2110]

Project    

:

Projects for the modernization of fuel facilities

Owner

:

ΒΡ Ηellas SA

Contract

:

2007

Duration

:

8 months

Budget

:

1,474,203.00 €

Brief description

:

The works were carried out at the regional facilities in the area of Linoperamata of Crete, in Igoumenitsa, in Kalamata, in Thessaloniki, and included the following: 

1.  Linoperamata, Crete, facility

§     Construction of product lines of tanks No 10 and 13, reconstruction of parts of product lines of tanks No 12/4/5/6, modifications of lines at tank basin No 12

§     Replacement of lines at the basin tunnel of tanks No 1, 2

§     Replacement of central line at the pump station and on either side of the tank road

§     Replacement of Jet A1 lines at the Pig station

§     Replacement of fire extinguishing lines of tank No 13, water line at tank No 18, modifications of fire extinguishing pump station

§     Replacement of oil/water separation lines of tank basins

§     Various  steel structures and supports

 

2.   Corfu facility

§     Installation of new reception fuel pipe of the Gouvies facility

The works included all building and mechanical works for the complete replacement of the underground reception line of 6’’ up to the pier.

§     Construction of fire extinguishing collector and other pipes at the Alykes facility

 

3.    Igoumenitsa facility

§     Construction of fuel networks and replacement of sections of product lines

§     Improvement of fire extinguishing network

 

4.    Kalamata facility

§     Replacement of fuel inlet pipes at the tanks and construction of new outlet pipes to loading lines

§     Modification of networks at the loading lines and tank pit

§     Construction of fire extinguisher collector and other fire extinguishing pipes

 

5.    Thessaloniki facility

§     Dismantling and installation of central water supply branches to loading lines and replacement of water network lines

§     Line conversions at the pig station and air networks

§     Construction and installation of heaters at the access networks

Pipe networks: c.s.  1"÷16".

The equipment and the materials for pipe networks were supplied by the owner.

The metal profiles for the  steel structures and supports, the materials of construction works, wherever carried out, as well as the sand blasting-painting materials were  supplied by our company.

All works were carried out without any interruption to the smooth operation of the facilities.

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.