Project
|
:
|
S-007/04 Rehabilitation works on fuel tanks TK-19 & TK-52
|
Owner
|
:
|
Hellenic Petroleum SA
|
Contract
|
:
|
08 / 02 / 2005
|
Duration
|
:
|
6 months
|
Budget
|
:
|
778,166.18 €
|
Brief description
|
:
|
The project was executed at the industrial facilities of Hellenic Oils in the area of Elefsina, Attica, during the program for the maintenance of the tanks and included the following works:
Replacement of bottom and ceiling sheets of tanks ΤΚ-19, diameter 71 m and TK-52 diameter 84 m, general maintenance works, total sand-blasting - painting of interior and exterior surfaces of the tanks.