Ελληνικά English
sitemap
Search
Heavy Industry » PROJECTS IN GREECE » SPECIAL PROJECTS » CONSTRUCTION OF TEMPORARY RAILWAY PLATFORM AT SYNTAGMA STATION LINE 3

Description

CONSTRUCTION OF TEMPORARY RAILWAY PLATFORM AT SYNTAGMA STATION LINE 3 [2042]

Project    

:

Construction of temporary railway platform at Syntagma station (line 3)

Owner

:

Attica Metro SA

Contract

:

2000

Duration

:

40 days

Budget

:

452,630.00 €

Brief description

:

The project was executed at the railway platform "Syntagma" of Attica Metro and concerned the construction of a temporary platform for the operation of "Syntagma" station as a terminal station. In particular:

§     Detailed design of  steel structure and expansion coatings of existing depot, as well as coverage of one traffic direction of the lines so that the station operates as a terminal one

§     Pre-construction of  steel structure

§     On-site implementation of metallic elements, coverage of metals with 20mm thick MDF, final coating with special anti-skid flooring and delivery of the depot in fully operational status

All on-site works were executed during night time between 23:00 to 04:00 of the next day, without interruption of ΜΕΤRΟ operation.

All project materials were  supplied by our company.

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.