Project
|
:
|
D.S.-2008/44 Revamp, maintenance and turn around (T/A) works of fluidized catalytic units U - 3200, U - 3300, U - 3400, U - 3500, U - 3800 FCC
|
Owner
|
:
|
Motor Oil Hellas S.A.
|
Contract date
|
:
|
28 / 05 / 2008
|
Duration
|
:
|
Turn around (Τ/Α) 26 days
|
Budget
|
:
|
1,149,516.00 €
|
Brief description
|
:
|
The project was executed at the refinery of Motor Oil (Hellas) in Corinth and included the following works:
- Unit and equipment blinding and de-blinding after the end of the works
- Opening of equipment for internal and external inspection: towers, reactors, tanks, filters, furnaces
- Internal and external repair and restoration works for the equipment shell, trays repairs, lining repairs, placement of double plating (pads)
- Dismantling and installation of heat exchangers and air-cooling units
- Replacement of one tower and vessels, on site re-tubing of two air coolers
- Replacement of parts of flue gas line of 36" diameter and various piping networks of petroleum products
- Replacement of valves and safety valves
|
|
|
|
|
|
|
|
|