Project
|
:
|
Maintenance works on furnace F-3202
|
Owner
|
:
|
Motor Oil (Hellas) SA
|
Contract
|
:
|
28 / 05 / 2008 and 6/7/2006
|
Duration
|
:
|
Partial works. (T/A) 12 days
|
Budget
|
:
|
455,390.00 €
|
Brief description
|
:
|
The project was executed at the refinery of Motor Oil (Hellas) in Corinth and included the following works:
- Prefabrication and preparation of all metal panels with the lining of furnace F-3202 (floor – ceiling – walls, northern conical part)
- Turn around works
- Dismantling of all metal parts of F-3202 and installation of new prefabricated parts
- Replacement of 8 tube-bundles with new prefabricated tube bundles
The works concerned the steam boiler furnace of the fluid catalytic crackling unit (F.C.C.).
|
|
|
|
|
|
|
|
|