Ελληνικά English
sitemap
Search
Heavy Industry » PROJECTS IN GREECE » TURN AROUND PROJECTS » MAINTENANCE WORKS ON FURNACE L - 3101 A/B

Description

MAINTENANCE WORKS ON FURNACE L - 3101 A/B [2010]

 

Project    

:

Maintenance works on furnace L-3101 A/B

Owner

:

Hellenic Petroleum SA

Contract

:

02 / 11 / 2009

Duration

:

(T/A) 7 calendar days

Budget

:

130,880.00 €

Brief description

:

The project was executed at the industrial complex of Hellenic Petroleum, Aspropyrgos, Attica, and included the following works:

§         Blinding, opening of furnace, construction of internal scaffolds for inspection

§         Replacement of tubes at the radiant section and supports recommended during the inspection, quality control, hydraulic test

§         Various maintenance works of furnace L-3101, such as valve replacement, replacement of sensors

§         Closing of furnace, restorations and commissioning

Tube cross-section: 6", thickness 8.5mm, material Α-213 GrT9, length 16,670mm

20 tubes of 6’’ were replaced.

Welding in total: 6" 46 pcs, 2" 8 pcs

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.