Heavy Industry » PROJECTS IN GREECE » TURN AROUND PROJECTS » T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012

Description

T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 [2001]

Project        

:

T-101. Partial shell replacement of atmospheric pipe still column

Owner

:

Hellenic Petroleum SA

Contract

:

09 / 05 / 2012

Duration

:

T/A 30 days

Budget

:

995,641.00 €

Brief description

:

The project was  executed at the industrial complex of Hellenic Petroleum, Thessaloniki, and included the following works:

a. Construction of a new part of tower Τ-101. h=7,452 mm, D=4,608 mm, t=19 mm

Shell: clad plates [SA516 Gr60 (16+3) mm type SS316 clad].

The construction included all necessary  nozzles (1" ÷ 20"), manholes and tray supports

b. Cleaning and internal inspection of the tower

c. Replacement of part (EL +10048 ÷ 17500) of tower Τ-101

§         Dismantling of all peripheral pipes, insulations, electrical works, instruments and  trays above EL +9000

§         Cutting of the tower in four parts – of total height of 58,625 m and diameter of 4608mm, dismantling, erection – mounting – welding of new part, erection – mounting – welding of old parts that were not replaced

§         Reinstallation of  all dismantled  parts

d. Internal lining: Monel EL +37500 ÷ +38010

    Lining height: 1,182 mm. Internal diameter: 3,674 mm

All materials and the equipment were supplied by the owner except the metal profiles for the construction of supports and the materials for the thermal insulation.

 

 

PROJECT CERTIFICATION

T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012
T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012 T-101 PARTIAL SHELL REPLACEMENT OF ATMOSHPERIC PIPE STILL COLUMN. TURN AROUND (T/A) 2012

 
<< Previous  |   Next >>

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.