Project
|
:
|
Fabrication and erection of 20'' pipe from Old National Road up to pier No1 E.I.C. for Cyprus water supply
|
Owner
|
:
|
Hellenic Petroleum S.A.
|
Contract
|
:
|
05/05/2008
|
Duration
|
:
|
30 days
|
Budget
|
:
|
366.928,83 €
|
Brief description
|
:
|
The project was executed at the industrial complex of Hellenic Petroleum, in Elefsina Attica and included the following works:
· Detailed line routing design.
· Prefabrication and erection of piping and equipment supports.
· Prefabrication and erection of 18'' water pipeline.
· Erection of ship loading equipment.
· Sandblasting and painting of pipes and steel structures.
All the works were executed in 24 hours base. All main piping materials were supplied by HELPE .