Project
|
:
|
S-008/07 Various piping & mechanical projects No2
|
Owner
|
:
|
Hellenic Petroleum S.A.
|
Contract
|
:
|
11/04/2008
|
Duration
|
:
|
14 months
|
Budget
|
:
|
848.638,46 €
|
Brief description
|
:
|
The project was executed at the industrial complex of Hellenic Petroleum in Elefsina, Attica, and included the following works:
- Field measurements and detailed design.
- Prefabrication of piping and equipment.
- Piping and equipment erection.
- Fabrication and erection of steel structures (equipment attics, pipe routing ways, pipe supports, etc.).
- Sandblast and painting of pipes - equipment and steel structures.
- Networks insulation using rockwool.
- Erection and removal of scaffolding.
The works on piping related to products networks and auxiliary lines and were performed on all production and handling units of the refinery.
Pipe sections ranged from ½'' - 56'' and materials were C.S. - A.S. - S.S.
All main piping materials and equipment were provided by Hellenic Petroleum.
PROJECT CERTIFICATION
|
|
|
|
|
|
|
|
|