Project
|
:
|
Subsea unloading pipeline 8" maintenance works
|
Owner
|
:
|
Rhodes-Alexandroupolis Oil Products Facilities SA
|
Contract
|
:
|
30/5/2002
|
Duration
|
:
|
10 calendar days
|
budget
|
:
|
108,000.00 €
|
Brief description
|
:
|
The project was executed at the facilities of Alexandroupolis of the company "Rhodes-Alexandroupolis Oil Products Facilities SA" and included the following works:
§ Excavation and surfacing of a sub-sea segment of pipe 8" at a length of 200m and removal of all boulder stones and pipe fixing elements (excavation of trench employing divers)
§ Partial floating off of the pipe using float means (float cranes, tugboats, divers)
§ Cutting of the last edge of the pipe at a length of 40m and welding of a new pipe, 100% X-R welds inspections.
§ Total inspection of the fuel unloading pipe
§ Setting, within the sub-sea trench, installation of all boulders and fixing elements of pipes and delivery in operational status
All pipe materials were supplied by the Owner