The project was performed at the facilities of ΒΡ Hellenic on Lesvos island and included the following works:
§ Construction and installation of reception lines from jetty, removal of old lines. It includes all construction works of underground pipe segments.
§ Rearrangement of loading filler, including removal of the entire equipment and piping network, installation of old – new equipment and interconnection of loading islets to the new design.
§ Works at fuel pump station
§ Construction of fire-fighting piping of the central network, fuel tanks, loading filler
§ Construction of new filler housing and removal of the existing one. Includes all foundation civil works
§ Re-construction of bollard. Construction of new ship bollard and on-site installation
§ Installation of segments on the pipeline network of products
§ Constructions at the product pump stations, installation and connection of new pumps, construction of a new jet A-1 filler, installation of new valves to product lines safeties and drains
§ Reconstruction of fire fighting pump station
§ Construction and installation of a waste tank
The equipment and piping materials were supplied by the Owner.
The metal profiles for steel structures and fixings, the materials for the civil works performed, and the sand blasting - painting materials were supplied by our company.
All works were performed without interruption to the smooth operation of the facilities.
|