The works were carried out at the facilities of BP in the area of Aspropyrgos, Attica, and included the following:
· Works on Skaramangas sea pier
Works for placement of equipment, extensions of reception pipe lines, placement of new valves in the interconnection line, installation of loading arm hydraulic system
Works with floating means (crane, towing vessels, etc)
· Works inside the facility
- Works for the placement of new network of lines at the loading lines
- Completion of reception lines of 12’’
- Conversions of product networks at tank pits B and C
- Maintenance works of various fuel tanks
- Connection of facility with the pier for heating oil deliveries
- Construction and installation of pipe protection systems at Aspropyrgos
- Replacement of flanges and placement of new valves
Pipe networks: c.s. 1"÷16".
All the equipment and the materials for pipe networks were supplied by the owner.
The metal profiles for the metal constructions and supports as well as the sand blasting-painting materials were supplied by our company.
All works were carried out without any interruption to the smooth operation of the facilities.
|