Project
|
:
|
Construction of a new fuel tank No. 4
|
Owner
|
:
|
Rhodes-Alexandroupolis Oil Products Facilities SA
|
Contract
|
:
|
2003
|
Duration
|
:
|
8 months
|
Budget
|
:
|
218,966.00 €
|
Brief description
|
:
|
The project was executed at the oil products facility of Rhodes and included the following works:
§ Design of implementation study for new tank & foundations.
§ Removal of old tank using water jet cutting
§ Foundation works for new tank
§ Construction of new Tank having diameter 10,550 mm & height 9,100 mm.
§ Pre-construction and installation of pipe networks for the interconnection of new tank with existing fuel networks.
§ Tank volumetric rating as per ISO 7507-4
§ Sand blasting – painting, internally – externally to the tank
.
|
|
|
|
|
|
|
|
|