The project was executed at the facilities of the new plastics factory of company 3P Romania at Iasi of Romania and included the following works:
- Full design of all engineering works facilities
- Installation of all factory equipment
- Construction of steam generation at 25 bar and hot water engine room
- Construction of cooler room producing cold water (20 – 40 C)
- Construction of air generation engine room
- Factory ventilation networks using air ducts system
- Construction of all piping networks for the interconnection of equipment – engine rooms and infrastructure (water supply -drainage, steam, hot water, cold water, air, etc.)
The equipment and pipe materials were supplied by the owner.
All materials required for the construction of all types of steel structures (attics, runways, staircases, supports, etc.) were supplied by our company.
|