The project was executed at the facilities of the ice cream factory of DELTA at Bucharest, Romania.
It was completed in three phases: 1997 1st phase, 1998 2nd phase, 1999-2000 3rd phase.
1st phase included full construction of a small ice cream factory with all necessary infrastructures for complete operation.
Thus, there was installation of all equipment necessary for ice cream production (aging units, freezers, ice cream machines, pumps, pasteurizer, C.I.P. equipment, etc.) and auxiliary equipment (ammonia engine room, steam engine room, water treatment system, air generation system, cold water production system, etc.).
At the same time there was construction of all necessary interconnection networks for all the above equipment (ΙΝΟΧ, steel, galvanized, etc.)
Next phases concerned expansions, improvements of the initial factory through the installation and interconnection of new equipment.
The expansion improvement works were performed at idle operation times of the factory and many of them during actual operation of the factory.
The equipment and pipes materials were supplied by the customer.
All materials required for the construction of all types of steel structures (attics, runways, staircases, supports) either ΙΝΟΧ or C.S. were supplied by our company.
|