Brief description
|
:
|
The project was executed at the ice cream facilities of Delta at Tavros, Attica and included the following works:
- Removal of all old equipment of the ice cream pasteurization unit and transportation outside the factory
- Installation of all new equipment at the new site (pasteurizers, holder, homogenizers, pumps, mix tank, vessels, pumps, etc.)
- Procurement of materials and construction of all steel structures, (attics, runways, escalators, racks pipes, supports, etc. Materials ΙΝΟΧ 304)
- Construction of all necessary production networks CIP, of water, air, steam, drainage and interconnection of new unit with the rest of the factory.
Materials AISI 316L/SMS 1145 Φ25¸101,4 mm.
The equipment and materials of product pipes networks and utilities (inox) were supplied by the Owner.
|