Project
|
:
|
Expansion of ammonia engine room
|
Owner
|
:
|
DELTA Dairy Industry SA
|
Contract
|
:
|
2002
|
Duration
|
:
|
4 months
|
Budget
|
:
|
325,700.00 €
|
Brief description
|
:
|
The project was executed at the facilities of the yogurt factory of Delta at Ag. Stefanos, Attica and included the following works
Design of ammonia equipment layout (compressors, pumps, ammonia vessels, ice basin) interconnection of all new equipment with pipes networks and connection of ammonia networks with existing freezer systems (carbon steel Φ 1''¸12''), procurement of materials and construction of all steel structures.
The equipment and ammonia pipes networks materials were supplied by the Owner.
|
|
|
|
|
|
|
|
|