The project was executed at the ice cream facilities of Delta at Tavros, Attica and included the following works.
- Ammonia chiller room reconfiguration.
Full reconfiguration of ammonia chiller room including design, installation of new ammonia compressors, new ammonia containers and pumps, reorganization of existing compressors and construction of all ammonia networks ( C.S. Φ 1/2'' – 12'' ) for the interconnection and integration of the chiller room.
- Milk reception unit
Full reconfiguration of the existing milk reception unit, installation of new equipment (flat type heat exchangers, pumps, vessels) and construction of all stainless networks ( AISI 316L / SMS 1145 Φ50,8¸101,4 mm ) for the interconnection of the reception unit and turn key delivery thereof.
All works were executed while the factory was operational.
The equipment and materials of product pipes networks and utilities (inox) were supplied by the Owner.
The ammonia network pipes materials and the steel profiles were supplied by our company.
PROJECT CERTIFICATION
|