Project
|
:
|
Mechanical works for the interconnection of the industrial complex A.I.C. with Hellenic Fuels (EL.KA). (A' Phase – works within A.I.C. area)
|
Owner
|
:
|
Hellenic Petroleum SA
|
Contract
|
:
|
23 / 03 / 2011
|
Duration
|
:
|
5 months
|
Budget
|
:
|
741,328.00 €
|
Brief description
|
:
|
The project was executed at the industrial complex of Hellenic Petroleum and Hellenic Fuels in the area of Aspropyrgos, Attica, and included the following works:
Complete prefabrication and erection of piping network of petroleum products and utilities with their supports, study of links and joints, material supply, prefabrication and erection of metal pipe racks
Total weight of steel structures and supports: 53,400 kg
Diameter inches: 14,865"
All the materials for the piping network were supplied by the Owner.
|
|
|
|
|
|
|
|
|