Project
|
:
|
Modernization works on a vapor recovery unit (VRU)
|
Owner
|
:
|
EKO-ELDA SA
|
Contract
|
:
|
2002
|
Duration
|
:
|
8 months
|
Budget
|
:
|
556,700.00 €
|
Brief description
|
:
|
The project was executed at the facilities of ΕΚΟ-ΕLDΑ at Skaramagkas, Attica and included the following works:
§ Full reconstruction of the existing VRU unit, including installation of new equipment and removal of existing equipment, interconnection of new and old equipment with pipes networks.
§ Installation of equipment at the loading islets and connection to the VRU unit.
The equipment and pipes network materials were supplied by the Owner.
|
|
|
|
|
|
|
|
|