The works were carried out at the facilities of BP Hellas, in Aspropyrgos, Attica, and included the following:
§ Construction and placement of metal pipe-rack with its foundation at the loading lines
§ Construction and placement of ground pipe-lines of 10’’ (at the metal corridor) for fuel delivery to the loading lines Unloaded 95, Ultimate, Heating gas oil & Jet A1 (12 lines in total)
§ Interconnection of the central pipe-rack lines with the loading island products
Pipe networks: c.s. 1”÷12”.
The equipment and the materials for pipe networks were supplied by the owner.
The metal profiles for the steel structures and supports, the materials of construction works, wherever carried out, as well as the sand blasting-painting materials were supplied by our company.
All works were carried out without any interruption to the smooth operation of the facilities.
|