Project
|
:
|
Revamp of pump stations and erection of new transfer lines
|
Owner
|
:
|
ΒΡ Hellas SA
|
Contract
|
:
|
2001-2002
|
Duration
|
:
|
Partial works. Total duration 14 months
|
Budget
|
:
|
762,600.00€
|
Brief description
|
:
|
The project was executed at the facilities of BP Hellas at Aspropyrgos, Attica and included the following works:
§ Replacement of three pumps and addition of a new pump at the pump stations of phases Α and Β
§ Modification of lines at the pump stations due to products change (suction – collapse of pumps)
§ Construction of two product lines 12" and 6" from pump stations to fillers
Pipe networks C.S 2" – 12"
All equipment and materials of pipes networks were supplied by the Owner.
The metallic profiles for steel structures and supports, as well as the sand blasting - painting materials were supplied by our company.
All works were performed without interruption to the smooth operation of the facilities.
|
|
|
|
|
|
|
|
|