The works were carried out at the facilities of BP Hellas, in Aspropyrgos, Attica, and included the following:
§ Works at the loading lines
- 6" Pipe lines
- Connections of overhead lines
- Constructions of 10’’ pipe lines
§ Works on the fire fighting system of the facility
- Construction of central fire fighting networks (water-foam)
- Replacement of cooling fire fighting networks (water-foam) of fuel tanks of A & B basin
§ Works at the reception lines from pier of petroleum products (2*16”, 1*12”)
- Partial replacements of underground reception lines from the facility to the pier (all earth works included)
- New pipe line routing for reception and connection with the distribution system at Aspropyrgos tanks (all earth works included)
§ Various works
- New pipe routing of Hellenic Petroleum at the facility (construction of new pipe-rack with foundations included)
- Restructuring of pipe lines at tanks 11, 12, 14
- Construction of metal cover in existing platform
- Construction of 3 overhead horizontal additive tanks
Pipe networks: c.s. 1”÷16”.
The equipment and the materials for pipe networks were supplied by the owner.
The metal profiles for the steel structures and supports, the materials of construction works, wherever carried out, as well as the sand blasting-painting materials were supplied by our company.
All works were carried out without any interruption to the smooth operation of the facilities.
|