The works were carried out at the pharmaceutical factory of Demo SA, Kryoneri, Attica, for the construction of a new factory (1st phase), and included the following:
§ Installation of equipment of water for injection unit, sterilized steam unit, liquid drug production units (pcs 8), sterilization furnaces (pcs 2), drip bottling machines (pcs 4) and cooling systems of cold water production
§ Construction of all necessary interconnection piping networks of the equipment and production units and interconnection with the initial factory, such as WF1 sterilized water networks, clean water, drugs, industrial steam, sterilized steam, cooling equipment
§ Construction of all necessary supports of pipes, platforms, corridors, stairs etc
The equipment and the pipe network materials (ΙΝΟΧ AISI 316L & 304) were supplied by the owner.
The metal profiles (INOX) for the construction of corridors, platforms, supports etc were supplied by our company.
The works were carried out in pieces over a period of 18 months depending on the arrival of the equipment.
|