The works were carried out at the drug factory of Demo SA, Kryoneri, Attica, for the construction of a new factory (2nd Phase), and included the following:
§ Installation-interconnection of drug production tanks (pcs 22)
§ Expansion of storage unit of water for injection, W.F.1, with the placement of new equipment
§ Expansion of clear water storage unit, P.W., with the placement of new equipment
§ Placement-interconnection of bottling machines (pcs 8)
§ Placement-interconnection of new sterilization furnaces (pcs 6)
§ Construction of new cold water pump station and interconnection with the equipment
§ Expansion of industrial steam networks
§ Interconnection of new equipment with the existing facilities
§ Construction of all necessary supports, pipes, platforms, corridors, stairs etc
The equipment and the pipe network materials (ΙΝΟΧ AISI 316L & 304) were supplied by the owner.
The metal profiles (INOX) for the construction of corridors, platforms, supports etc were supplied by our company.
The works were carried out in pieces over a period of 28 months depending on the arrival of the equipment and the factory production requirements.
.
|