The project was executed at the ice cream facilities of Delta at Tavros, Attica and included the following works
a) New ice cream aging unit
- Removal of all old equipment and transport outside the factory (aging units, containers, etc.)
- All necessary civil works for the support of new aging units
- Installation of all new equipment (aging units, vessels, pumps, freezers etc.)
- Construction of all manifolds and pipe networks (AISI 316L / SMS 1145 Φ25,4¸76,1) for the interconnection of the new aging unit with the production machines (freezers, ice cream machines)
- Procurement of materials and construction of all steel structures (attics, runways, escalators, supports. Materials ΙΝΟΧ 304)
b) C.I.P. Unit
Full construction of new C.I.P. unit including installation of all new equipment (C.I.P. tanks, C.I.P. pumps, heat exchangers, vessels, chemicals pumps, etc.) interconnection of equipment to piping networks, interconnection of a new unit with the factory networks ( AISI 316L / SMS 1145 Φ25,4¸101,6 mm) and procurement of materials and construction of all steel structures (materials ΙΝΟΧ 304)
The equipment and materials of product pipes networks and utilities (Inox) were supplied by the Owner.