The works were executed at the country facilities of BP Hellas at Linoperamata Crete, Corfu, Igoumenitsa, Lesvos and included the following works:
1. Linoperamata, Crete Facility
§ New gasoline lines construction
§ Engineering conversions for the storage of summer heating oil
§ Construction of fire fighting network of the coastal pump station, replacement of water-foam fire fighting network and foam lines for tanks Νο 7, 8
§ Improvement of boom system
§ Construction of foam tank, sheds and pipes network
2. Corfu Facility
§ Construction of phase Α of the reception pipe 8"
§ Construction of pipe lines network and various engineering structures
§ Various maintenance works for the pump station, pigging station, product tanks
3. Igoumenitsa facility
§ Gas reception pipe line installation
§ Relocation of oil pipe lines
§ Installation of connections hub with tanks
§ Various maintenance works of the foam fire fighting network and pipes network
4. Lesvos island facility
§ Construction of pipe lines of fuels pump station
§ Change of pipe lines at 4" and construction of new islands
§ Gasoline pipe line 6"
The equipment and piping materials were supplied by the Owner.
The metal profiles for steel structures and fixings, the materials for the construction works executed, and the sand blasting - painting materials were executed by our company.
All works were executed without interruption to the smooth operation of the facilities.
|