Project
|
:
|
Repairs on refinery distribution pipelines during S.D. 2008 at HEL.PE/E.I.C.
|
Owner
|
:
|
Hellenic Petroleum S.A.
|
Contract
|
:
|
25/09/2008
|
Duration
|
:
|
30 days
|
Budget
|
:
|
179.182,70 €
|
Brief description
|
:
|
The project was executed at the industrial complex of Hellenic Petroleum, in Elefsina Attica and included the following works:
- Field measurements and detailed design.
- Prefabrication of piping and equipment.
- Piping and equipment erection.
- Fabrication and erection of steel structures (pipe supports etc.).
- Sandblast and painting of pipes - equipment and steel structures.
- Networks insulation using rockwool.
- Erection and removal of scaffolding.
Pipe sections ranged from ½'' - 24'' and materials were C.S.
All main piping materials and equipment were provided by Hellenic Petroleum.