|
Project
|
:
|
Hot taps drilling works (estimated 45 tie-ins hot taps)
|
Owner
|
:
|
Hellenic Petroleum S.A.
|
Contract
|
:
|
31/05/2010
|
Duration
|
:
|
5 months
|
Budget
|
:
|
94.304,95 €
|
Brief description
|
:
|
The works carried out related to the prefabrication of pipe spools ranging from 4'' to 24'' for Hot taps drilling, welding of such spools without flow interruption to the existing product pipelines and subsequent Hot taps drilling with Hellenic Petroleum equipment.
During the works, there was performance of quality checks such as M.T. U.T. R.T. & P.T.
PROJECT CERTIFICATION
|
|
|
|
|
|
|
|
|