Project
|
:
|
Replacement of pipes for the operation of the low sulfur fuel project and ballast circuits piping modification at the bunkering stations of E.I.C.
|
Owner
|
:
|
Hellenic Petroleum S.A.
|
Contract
|
:
|
20/07/2007
|
Duration
|
:
|
5 months
|
Budget
|
:
|
129.226,28 €
|
Brief description
|
:
|
The project was executed at the industrial complex of Hellenic Petroleum, in Elefsina Attica and included the following works:
· Construction of scaffolding.
· Prefabrication and erection of pipes.
· Fabrication and erection of steel structures and supports.
· Equipment erection.
· Pipes, steel structures and equipment sand blasting & painting.
· Pipes insulation.
All main piping materials were supplied by HELPE .