The project was executed at the industrial complex of Hellenic Petroleum in Elefsina, Attica, and included the following works:
Prefabrication and erection of piping networks of petroleum products and utilities, hydraulic tests of networks, placement of supports and various steel structures and commissioning
The works were carried out at the central pipe-rack of the new refinery.
Pipes diameter ½" ÷ 56", thickness up to 24mm
Materials: carbon steel, alloy steel, stainless steel.
Tests of product networks and utilities: 20 bar ÷ 220 bar.
Total weight of piping networks: 2,180,120kg
Total weight of supports – steel structures: 251,100kg
inches: 87,350.
All materials were supplied by the owner/ customer of the project