|
Project
|
:
|
Repair works on naphtha pipe lines
|
Owner
|
:
|
Hellenic Petroleum S.A.
|
Contract
|
:
|
70.000,00 €
|
Duration
|
:
|
5 months
|
Budget
|
:
|
68.567,58 €
|
Brief description
|
:
|
The project was executed at the industrial complex of Hellenic Petroleum, in Elefsina Attica and included the following works:
- Field measurements .
- Prefabrication of piping.
- Piping erection.
- Sandblast and painting of pipes.
- Erection and removal of scaffolding.
All main piping materials and equipment were provided by Hellenic Petroleum.
PROJECT CERTIFICATION
|
|
|
|
|
|
|
|
|