Project
|
:
|
Project 2279 – New CDU Complex
|
Owner
|
:
|
Motor Oil (Hellas) SA
|
Contract
|
:
|
02 / 06 / 2009
|
Duration
|
:
|
12 months
|
Budget
|
:
|
4,734,907.48 €
|
Brief description
|
:
|
The project was executed at the Refinery of Motor Oil (Hellas), in Corinth, and included the following works:
- Erection of pipe rack and supports for the piping interconnection of the North Refinery
- Mechanical interconnection works of the North Refinery
- Prefabrication and erection works of piping networks of petroleum products and utilities for the interconnection of the North Refinery
- Sandblasting-painting works of piping networks
Pipes diameter: 1 ½" – 48", thickness up to 28mm. Materials: carbon steel, alloy steel, stainless steel. Pressure Tests of product networks and utilities: 20÷280bar.
Total weight of pipes: 631,600 kg
Total weight of pipe rack and supports: 340,000 kg
Project’s diameter inches: 47,500
All project materials were supplied by the owner.
The project was executed in Joint Venture with the BIEK company. Participation of ET.M.ER 50%.