Project
|
:
|
Construction of temporary railway platform at Syntagma station (line 3)
|
Owner
|
:
|
Attica Metro SA
|
Contract
|
:
|
2000
|
Duration
|
:
|
40 days
|
Budget
|
:
|
452,630.00 €
|
Brief description
|
:
|
The project was executed at the railway platform "Syntagma" of Attica Metro and concerned the construction of a temporary platform for the operation of "Syntagma" station as a terminal station. In particular:
§ Detailed design of steel structure and expansion coatings of existing depot, as well as coverage of one traffic direction of the lines so that the station operates as a terminal one
§ Pre-construction of steel structure
§ On-site implementation of metallic elements, coverage of metals with 20mm thick MDF, final coating with special anti-skid flooring and delivery of the depot in fully operational status
All on-site works were executed during night time between 23:00 to 04:00 of the next day, without interruption of ΜΕΤRΟ operation.
All project materials were supplied by our company.
|
|
|
|
|
|
|
|
|