The project was executed at the industrial complex of Hellenic Petroleum, in Elefsina Attica and included the following works: Internal and external maintenance works of fractional distillation and pressure vessels of all refinery units, replacements of piping networks of petroleum products and utilities, pipe and equipment insulation works and strengthening of existing pipe rack.
Furthermore, replacement of the upper part of the central distillation column of refinery Τ-101.
Tower Τ-101 basic plate : Diameter 4.55m, upper part weight 42,000kg, shell thickness 16mm, c.s. material, upper part height ~11,900 mm
Pipes diameter: ½" ÷ 56"
Materials: Carbon steel, alloy steel, stainless steel
The equipment and the piping network materials were supplied by the Owner.
The materials for the civil works, for the steel structures of any kind, for the thermal insulations and sandblasting-painting works were supplied by our company.
PROJECT CERTIFICATION
|