The project was executed at the facilities of BP Hellas, in the area of Aspropyrgos, Attica and included the following:
Full construction and commissioning of the new section of the Aspropyrgos facilities
- Civil works
Full construction of two new fuel tank basins with reinforced concrete side walls; construction of foundations for four tanks; landscaping; construction of electrical trunks
- Fuel tanks
Full construction of four (4) new metal fuel tanks according to ΑΡΙ 650.
Tank dimensions:
ΤΚ-16,17,19 Diameter D=34m Height Η= 11m
TK-18 Diameter D=24m Height H= 11m
- Mechanical works
§ Full construction of two new fuel pump stations
§ Construction of all fuel pipe works connecting new tanks- pump stations with loading lines, offtakes and old facility
§ Construction of all fire protection networks of the extension
§ Construction of all required pipe-racks for pipe passage
§ Sand blasting and painting of pipe networks and metal constructions
- Electrical and instrument works
Full construction of all electrical power network and instrument works, project lighting works and interconnection works between new and old facility
All main materials of the project were provided for to the Contractor by BP Hellas. The materials for civil works, metal profiles for the pipe-racks - pipe supports, grates and electrical instrument tubes and sand-blasting-painting works were supplied by our company.
PROJECT CERTIFICATION
|